 ====== Zeche Friedrich-Heinrich: Kamp-Lintfort wide Open LoRaWAN deployed! ====== ====== Zeche Friedrich-Heinrich: Kamp-Lintfort wide Open LoRaWAN deployed! ======
  
-(Jan Sonntag, Rolf Becker, 2022-10-19)+(Jan Sonntag, Shreya Gupta, Rolf Becker, 2022-10-19)
  
 Kamp-Lintfort is now covered by the community-driven **open LoRaWAN** network of **[[https://www.thethingsnetwork.org/|The Things Network]] (TTN)!** Kamp-Lintfort is now covered by the community-driven **open LoRaWAN** network of **[[https://www.thethingsnetwork.org/|The Things Network]] (TTN)!**
Line 30: Line 30:
  
 As of writing this there where no test done yet on the southern gateway. As of writing this there where no test done yet on the southern gateway.
 +
 +===Network Activity===
 +
 +| {{ :blog:lorawan_ttn_zechenturm_nord.png?direct&400 |}} | {{ :blog:lorawan_ttn_zechenturm_sued.png?direct&400 |}} |
 +| Fig.: Activity of north-east gateway (2022-10-19T16:45) | Fig.: Activity of south-west gateway (2022-10-19T16:45) |
  
 The system is all powered through mains power provided by the tower itself. On the northern side, an electrical box is located where all the network and power distribution over PoE (Power over Ethernet) is done. The idea is to later add a redundant internet connection as well. The system is all powered through mains power provided by the tower itself. On the northern side, an electrical box is located where all the network and power distribution over PoE (Power over Ethernet) is done. The idea is to later add a redundant internet connection as well.
Line 35: Line 40:
 More tests with the system will be done in the near future. More tests with the system will be done in the near future.
  
-We would like to thank the **Municipality Kamp-Lintfort** as well as **Elektrosteiger Jörg Hunsmann** representative for the **[[https://bergmannstradition.de/|Fördergemeinschaft für Bergmannstradition - Linker Niederrhein - e.V.]]** for their fantastic support! +We would like to thank the **Municipality Kamp-Lintfort** as well as the former **Elektrosteiger Jörg Hunsmann** representing the **[[https://bergmannstradition.de/|Fördergemeinschaft für Bergmannstradition - Linker Niederrhein - e.V.]]** for making it possible and for their fantastic support!