solar_panel:start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Last revisionBoth sides next revision | ||
solar_panel:start [2021/07/07 14:17] – add datasheet files jeff001 | solar_panel:start [2021/07/07 15:46] – jeff001 | ||
---|---|---|---|
Line 17: | Line 17: | ||
- Mobile system: 2 sets of 5 PV modules each on the green area, using a Flat mounting system on mobile platform mechanism that allows us to tilt the PV modules. | - Mobile system: 2 sets of 5 PV modules each on the green area, using a Flat mounting system on mobile platform mechanism that allows us to tilt the PV modules. | ||
- | Set of 5 vertical PV modules in a row: | + | Set of 5 vertical PV modules in a row - arrangement:\\ |
- | {{: | + | {{: |
===== Photovoltaic system layout ===== | ===== Photovoltaic system layout ===== |
solar_panel/start.txt · Last modified: 2021/08/24 17:35 by 127.0.0.1